METROPOLITAN ST. LOUIS SEWER DISTRICT – LOWER MERAMEC WASTEWATER TREATMENT PLANT

This state-of-the-art wastewater treatment facility is capable of processing 28 million gallons per day (MGD) of secondary, with a peak build-out capacity of 56 MGD by 2020.

company website KWAME, as a sub-consultant to Jacobs Engineering (formerly Sverdrup Civil, Inc.), managed construction of the new wastewater treatment facility, and provided inspection services, claims management, quality control and schedule monitoring. Emure-Ekiti KWAME oversaw eight separate construction projects including Site Preparation, Site Preloading – Phase I, a 1.5-mile wastewater Outfall sewer to the Mississippi River, the Wastewater Treatment plant, Electrical Supply, Site restoration and Landscaping, Lagoon Decommissioning & Sludge Removal and, finally, Site Preloading – Phase II to prepare the site for future facility expansion.

Brian Hoelscher
Director, Engineering
Metropolitan St. Louis Sewer District
2350 Market Street
St. Louis, MO 63105

$120 Million

2010